Dive into Our Project Gallery

Welcome to our project gallery, where innovation meets creativity. Explore a diverse collection showcasing our latest ventures and achievements. Dive into discover how we're shaping the future.

500+

Project Completed

50Lakhs+

Square Feet

Industrial and Institutional

New Factory for Micron Instruments Pvt Ltd

Location-Industrial Estate Barwala, Haryana, 150000 Sft, 16 Crore, First phase completed 2014, Second phase completed 2019

This factory is to produce high precision parts as original equipment for national and international medical equipment and arms manufacturers. Three huge courtyards inside the complex provide natural lighting. A 500 kW SPV plant on the terrace augments the power supply. Elaborate water harvesting and terrace insulation contribute to the green quotient of the building. The functionality of the building is not to be compromised by the modern exterior. An IGBC factory rating is applied for and we are confident of getting a 'Gold' mark for this.

Remodeling and Interiors for Taratec

Location-Parwanoo, 22500 Sft, 5 Crore, 2022

A high tech factory supplying watch dials to reputed manufacturers in Switzerland was looking to energize their work spaces. Colours and materials were judiciously used to increase productivity and worker satisfaction at a minimum cost. Streamlining of services without compromising on flexibility was the hallmark of this phase.

GRAPHENE

Location-IT Park, Chandigarh, 100000 Sft, 25 crore estimated, 2015

This hi-Tech office building coming up at Panchkula IT Park was to be 'iconic' as per the clients wishes. The top four floors are supported by an elevator shaft making it a complex structural design. The visual aesthetic did not compromise with the functionality and the integration of services which was seamless across all floors.

Factory for Lee Cooper Shoes

Location - Baddi, 100000 Sft, 5 crore, 2005

The structure for this large shoe factory is envisaged as a flat slab. This has allowed easy integration of services and an abundance of light and ventilation.The large floor plate with no central beams allowed for easy integration of essential services. Passive ventilation systems along with adequate natural light added to the comfortable work environment inside the building.

Remodeling for Taratec

Location-Parwanoo, 100000 Sft, 5 crore, 2005

A high tech factory supplying watch dials to reputed manufacturers in Switzerland was looking to streamline their workflow. Careful planning ensured minimum disruption in the process workflow while ensuring a tangible positive difference in the work environment post renovation.

New Plant for Asian Lignin Manufacturing Ltd.

Location-ABC Papers, Saila Khurd, 12000 Sft, 40 Lacs, 2005

A six storey RCC building to accommodate the complex machinery required to purify lignin. A simple optimally designed frame structure ensured a speedy implementation to meet tight deadlines.

New Office Complex for GEEKAY International

Location - Leather Complex, Jalandhar, 12000 Sft, 65 Lacs, 2010

An international styled building to house the offices for one of the largest leather export houses in Jalandhar.